Replaced a fifteen-year-old back-office tool. New system shipped in eleven weeks with zero downtime cutover.
Legacy back-office tool was a single point of failure for 11 teams. A previous vendor had taken 14 months and not shipped.
Read-only mirror against the legacy DB for week one. Incremental cutover by team, each behind a feature flag, validated against the legacy in shadow mode.
Full cutover at week 11 with zero downtime. Every team migrated voluntarily none asked to roll back.
We built a co-pilot that classifies CI/CD failures, generates fix candidates, and coordinates remediation across GitLab and GitHub.
Real-time route optimization across 1,200 vehicles. Replaced an ILP solver and a half-time analyst.
Document understanding pipeline for 14 clinical specialties. From intake form to structured EHR record in 90 seconds.